| 1 | The design of the field project | [1] |
| 2 | The performing of the networks | [1] |
| 3 | The building of the triangulation points and surveying | [1] |
| 4 | The building of the benchmark points and surveying | [1] |
| 5 | The height network building and surveying | [1] |
| 6 | The polar surveying methods | [1] |
| 7 | The polar surveying methods | [1] |
| 8 | Midterm Exam | |
| 9 | Cross section surveying | [1] |
| 10 | The calculation of the horizontal coordinates of the triangulation and benchmark points | [1] |
| 11 | The calculation of the vertical coordinates of the triangulation and benchmark points | [1] |
| 12 | The preparation of the coordinates files of the project areas | [1] |
| 13 | The mapping of the project area | [1] |
| 14 | The drawings of the cross-section | [1] |
| 15 | The drawings of the cross-section | [1] |
| 16 | Final exam | |